The bill of quantities, or BOQ, is the heart of every works tender in Bangladesh, and bill of quantities BOQ pricing is the skill that separates contractors who make money from those who win work and lose money on it. The BOQ lists every item of work in a project, with quantities and a blank rate column for you to fill in. Price it well and you win work you can deliver at a profit. Price it carelessly and you either lose the tender or win a contract that drains your business.
What Is a Bill of Quantities?
A BOQ breaks a project down into measurable items: excavation in cubic metres, brickwork in cubic metres, plaster in square metres, steel in kilograms, and so on. Each item has a description, a unit, a quantity, and a space for your rate and amount. The quantities are usually prepared by the procuring entity's engineers, and your job is to put a realistic rate against each one.
In Bangladesh, the BOQ comes with the tender documents on the e-GP portal, and its total forms your bid price. Every rate matters, but some matter far more than others.
How to Read a BOQ Before You Price It
Never start pricing until you have read the whole BOQ alongside the drawings and specifications. A rate means nothing without the specification behind it: concrete of one grade costs far more than another, and a plaster item priced without knowing its thickness is a guess.
In most works tenders, a few items, often earthwork, concrete, reinforcement steel, brickwork and finishing, make up the bulk of the total. Price those with the most care, and check the quantities against the drawings: they are usually close, but errors happen, and one that looks far too high or too low deserves a clarification through the e-GP portal before the deadline.
Building Your Rates from Real Costs
A good rate is built up from its components, not guessed from the total. For each item, work out:
- Materials: the cost of cement, sand, aggregate, steel or bricks delivered to the site, including wastage. Prices vary by district and season, so use current local rates.
- Labour: the cost of the skilled and unskilled workers needed, at the wages you actually pay in that area.
- Equipment: hire or running costs for mixers, vibrators, scaffolding or transport, spread across the quantity.
- Overheads and profit: site establishment, supervision, insurance and head office costs, plus a margin that keeps the business viable.
Keep a rate library of your own costs, updated with current prices and wages. Bidders who price from a maintained rate file are faster and more accurate than those who start from scratch each time.
Common BOQ Pricing Mistakes
Most BOQ errors are avoidable, and most are expensive:
- Guessing rates: a rate written without a build-up is a gamble. If the real cost is higher, you pay the difference yourself.
- Forgetting wastage and transport: materials are priced at the supplier's yard, but your cost is at the site. Transport, loading and wastage add up, especially on remote sites.
- Using old prices: cement and steel prices move. A rate built on last quarter's prices can be out of date before the bid is submitted.
- Arithmetic errors: a wrong quantity times rate, or a total that does not add up, can disqualify a bid. Always check the totals twice.
- Unbalanced pricing: deliberately inflating early items to get paid sooner is risky. Evaluators notice unbalanced rates, and some tenders reject them.
Pricing Strategy: Where to Be Competitive
Not every item needs your sharpest price. On the high-value items that decide the total, price keenly and from real costs. On low-value items, a standard rate from your library is usually enough. The goal is a total that is competitive without being so low that you cannot deliver.
Consider the site conditions too. A project far from material sources, with poor access or limited water and power, costs more to execute than the same work in Dhaka. Visit the site before you finalise your rates, so ground conditions and access do not surprise you later.
Checking Your BOQ Before Submission
Before you submit, run a final check. Every item should have a rate, including the small ones. The arithmetic should add up, and the total should match your bid summary. Compare your total against the tender's estimated value too: if it is far below, ask yourself why. Sometimes you genuinely are cheaper, but often a low total means something was missed.
Price the BOQ Like It Is Your Money, Because It Is
A priced BOQ is a commitment. Once the contract is signed, those rates are what you get paid, whether or not they cover your costs. Treat the BOQ as the most important document in the tender, build every rate from real costs, and check the totals before you submit.
Good pricing is a habit, not a talent. Keep your rate library current, visit every site, and review each result afterwards so the next BOQ is sharper than the last. If you would like a second pair of eyes on your pricing before a big submission, MAS Corporation prepares and prices BOQs for bidders across Bangladesh, and our team holds an 86% bid success rate across 175+ projects. Contact us before your next deadline and we will help you price it right.